Reduce Accidents In Process Industries

The final testing before the blasting and painting of pressure equipment is normally the Proof Pressure or Leak Test. 

Pressure testing is a high-risk activity. Since pressure tests are conducted above the normal maximum allowable working pressure, they shall be carried out under controlled conditions, with appropriate safety precautions. Therefore the development of special procedures are essential.

To ensure safety at the highest level, your personnel responsible for pressure testing ought to be familiar with the code requirements. It might seem challenging for them as different international codes and standards require different approaches.

This course on Leak or Pressure Testing of Pressure Equipment enables participants to develop applicable pressure test procedures and to carry out the pressure test in accordance to code requirements.
 

 

DOWNLOAD BROCHURE 2017

 

VENUE
IDC Training House, Puchong, Selangor, Malaysia